ISLAMABAD: A major scare unfolded at Pakistan’s Tarbela Dam in Khyber Pakhtunkhwa province after a protective barrier at the partially constructed T-5 hydropower project collapsed, triggering a sudden surge of floodwater.
The barrier failure led to a rapid flow of water, raising concerns over the safety of workers and infrastructure at the project site.
In a dramatic rescue operation, a worker who was swept away by the surging water was successfully rescued.
Fortunately, no casualties have been reported so far. The incident has once again raised serious questions about construction-site safety and protective measures at major infrastructure projects.
Authorities are expected to assess the damage and investigate the circumstances surrounding the barrier collapse.
Comments
Sign in with Google to comment.